Field House, CM16
A project in a semi-rural location surrounded by fields and near Epping Forest. The property was built in 1955 and is currently uninsulated and heated with an oil-fired burner. The aim is to undertake a deep retrofit to the EnerPHit standard using natural and breathable materials with low-embodied carbon, triple glazing throughout, mechanical ventilation with heat recovery and an air-source heat pump. The end result will be a highly efficient and healthy building requiring almost no heating. More soon…